Case Study

Sediment Transport and Management Study

Overview

Project Challenges:
  • Harsh tidal environment
  • Zero underwater visibility
  • Busy terminal with limited survey windows
  • Complex large-scale estuary processes
  • Complex local hydrodynamic-structure-vessel triad interaction
Project Highlights:
  • Inclusion of pile array and loading vessel in the MISED 3D numerical model
  • Dedicated survey team equipped with fast response advanced 3D Echoscope imaging system
  • Innovative measurement techniques
  • Real-time post-processing of survey data
  • Development of decision-making tools for dredging

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now