Case Study

Rio Cruces Estuarine Wetland Assessment

Overview

Project Challenges:
  • Hydrodynamic model calibration was problematic given lack of available historic data
  • Establish accurate modeling parameters for a large wetland covered with trees and dense vegetation
  • Very complex environmental history due to significant changes to the estuary in a short number of years
Project Solutions:
  • Comprehensive field studies including topographic and hydrographic surveys, and extensive marine instrumentation were completed
  • Site specific non-linear spatial roughness parameters that varied with depth were developed
  • An extensive data analysis plan was developed including geotechnical tests, organics, Pb210 and Cs137 dating, stable isotopes analysis, metals, diatoms, water quality, thecamebans, mass spectrometry and erodibility

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now