Project Challenges:
  • Locate over 15M cubic yards of sediment to cost-effectively build the project
  • Optimize construction elevations to account for high relative sea level rise rates
  • Locate and avoid oil and gas infrastructure in the borrow and construction areas
Project Solutions:
  • Identification and development of numerous borrow areas in the Mississippi River and offshore
  • Evaluation of local soil conditions to determine consolidation of the underlying soils during and following construction
  • Location of borrow areas with sandy material to minimize primary consolidation of the fill material

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.