Project Challenges:
- Harsh tidal environment
- Zero underwater visibility
- Busy terminal with limited survey windows
- Complex large-scale estuary processes
- Complex local hydrodynamic-structure-vessel triad interaction
Whiting, IN, USA
An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.
Lake Nipigon, ON, Canada
Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.