Project Challenges:
  • Strict budget limitations due to funding agreements
  • Strict schedule constraints associated with the funding agreements
  • Difficult soil conditions due to weak unconsolidated confined disposal facility materials overtop of peat
  • Maintain port operations through construction in the entrance channel
Project Solutions:
  • To assist the client in understanding their financial commitment, Baird undertook an estimate of construction cost from first principles using material supply prices, construction crew build-up, equipment selection, and productivity rates obtained from our in-house database
  • Worked closely with the contractor to develop an alternative tieback anchor design, eliminating the need for underwater connections, which resulted in schedule and worker safety improvements while reducing cost
  • Developed a robust steel sheet pile – pipe pile (combi-wall) quay wall design with inclined rock anchors
  • Port operations were successfully managed throughout the construction process
  • Construction of the new berth and associated facilities was completed ahead of schedule and within budget

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now