- 650m long berm breakwater with a 7.8m design wave
- Multi-use quay with 500m of berth length
- Shiploader and conveyor foundations
- Dredging to a depth of 17m to accommodate 60,000 DWT vessels
- Reclamation of 32 hectares for onshore works
- Quarry development for 3 million tonnes of stone
- Navigation aids system involving buoys, dual sets of range lights, and onshore works
- Fuel pipeline corridor
- Full support facilities
Explore Other Case Studies
-
Whiting Lakefront Park
Whiting, IN, USA
An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.
-
Whitesand First Nation Shoreline Stabilization
Lake Nipigon, ON, Canada
Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.