Project Challenges:
- Limited information was available regarding the design, construction and maintenance/repair of the existing breakwater
- Large tidal range results in significant variation in exposure of the structure to waves
- Harsh marine environment required a robust solution to limit maintenance requirements
- Design of upgrade works was complicated by the need to effectively integrate the new works with the existing structure