Project Challenges:
- Simulation of different hazard types at a national level
- Compilation of a nation-wide asset inventory that included susceptibility information
- Assessment of potential future damages in regions with limited historical information
Whiting, IN, USA
An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.
Lake Nipigon, ON, Canada
Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.