Case Study
Eastern Beaches Stabilization and Enhancement
Overview
- Class EA included extensive public consultation
- Design concept for each site varied to suit specific objectives/requirements
- Physical model used to optimize design of submerged offshore breakwaters
- Project was constructed on budget and ahead of schedule