Case Study

Climate Change, Water Resource Management and Flood Resilience in Barbados

Overview

Project Challenges:
  • A fast-paced project schedule
  • Understanding and quantifying a complex hydraulic environment
  • Addressing the uncertainty and variability in future climate change impacts
  • Completion of an extensive field and data collection program
  • Development of an educational program to meet the needs of diverse audiences
Project Solutions:
  • A comprehensive assessment of stormwater pathways and existing drainage infrastructure capacity
  • Conceptual design of improvements to stormwater infrastructure for 59 watersheds
  • Detailed designs and tender package developed for selected drainage improvement projects
  • Detailed characterization of surface and groundwater quality in study area
  • Island-specific educational website:  http://barbadosclimatechange.com/

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now