Cayman Islands Cruise Berthing Facility

Overview

Project Challenges:
  • Congested harbour area serving both cruise and cargo operations
  • Proximity to very deep water limits the area where development is practical
  • Presence of significant and healthy coral reefs
  • Variable geotechnical conditions (calcareous sediments)
  • Exposure to hurricane waves and earthquakes
Project Solutions:
  • Planning and execution of comprehensive stakeholder and public consultation process
  • Assessment of natural hazards, including hurricanes, earthquakes and climate change
  • Site investigations, modelling and analyses to define baseline conditions and to identify/quantify anticipated impacts of project construction and operation;
  • Development of refined project layout that significantly reduces dredging and associated adverse impacts on the marine environment while also providing improved functionality
  • Identification of mitigation measures to reduce other adverse impacts

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now