Case Study

Cat Islands Chain Habitat Restoration

Overview

Project Solutions:
  • The form of the island was created with containment dikes
  • Extensive physical modelling determined the optimum shoreline configuration to enhance habitat
  • Construction of a spine of the island was proposed to provide a platform for equipment access and offer wave protection

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now