Case Study
Australian Cyclonic Storm Tide Hazard Database
Overview
Project Highlights
- World-leading application of large, unstructured mesh hydrodynamic model
- Cloud computing used to complete over 100,000 simulations, requiring 18-years of CPU time in less than 30-days
- High model validation performance for cyclone track / intensity / frequency at landfall, cyclonic winds, tide and storm surge
- Inundation from wave run-up and setup included for areas adjoining coastlines with wave energy
Explore Other Case Studies
-
Whiting Lakefront Park
Whiting, IN, USA
An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.
-
Whitesand First Nation Shoreline Stabilization
Lake Nipigon, ON, Canada
Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.