baird climate logo

This site uses cookies to give you the best experience. By continuing to browse the website you agree to the cookies policy.

Case Study

Ashbridges Bay Treatment Plant Outfall

Overview

Project Highlights

  • A lake-wide MIKE3 model of Lake Ontario was used to capture the complex hydrodynamic processes including upwelling
  • The comprehensive modeling effort used CORMIX and MIKE3 to model the full range of conditions
  • The new outfall will extend to the edge of the Toronto Scarp, discharging effluent to the zone nearest to deep water
  • A comprehensive field data collection and monitoring program was implemented
  • Sediment processes modeling was undertaken to evaluate potential impacts of sediment on the diffuser

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now