Case Study

Arica Breakwater

Overview

Project Highlights
  • An innovative solution for repairing the breakwater with CoreLoc units was developed using physical model testing.  This solution saved our client 30 % in costs
  • Aerial images over the past four years have been taken from drones. Standard topographic surveys have been replaced by aero photogrammetry from drone images and/or laser surveys
  • No major damage to the repaired section was observed after the 2014 Iquique earthquake

Explore Other Case Studies

  • Whiting Lakefront Park

    Whiting, IN, USA

    An assessment of storm damage to a rubble mound revetment protecting a park in Whiting, IN, along with the design and construction of emergency repair works and preliminary design development for comprehensive rehabilitation works for the structure.

    View Full Case Study
  • Whitesand First Nation Shoreline Stabilization

    Lake Nipigon, ON, Canada

    Baird was retained to complete the planning, design and construction services to protect 1,400 metres of eroding shoreline on Whitesand First Nation traditional land, located on the north shore of Lake Nipigon. The design consisted of an armour stone revetment and slope stabilization.

    View Full Case Study
Apply Now